The Project includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to the following:
1. Construction of a new potable water booster pump station and caustic soda chemical dosing facility to adjust pH in the drinking water supply system, including:
a. Concrete foundations
b. Masonry block building
c. Pre-Engineered trusses
d. Building envelope
2. Site development including:
a. Excavation and site works
b. Watermain tie-ins
c. Drainage systems
d. Paving
e. Buried FRP tank
f. Testing and flushing of new and existing watermains
3. Process mechanical including:
a. Stainless steel piping
b. 2 x 100hp vertical turbine pumps
c. 30 hp groundwater pump
d. Pressure reducing and relief valves
e. Peristaltic metering pumps
f. Water softeners
g. Chemical process piping, valves and appurtenances
h. 2 x 12,000 L insulated FRP chemical tanks
4. Electrical work including:
a. MCC including VFDs, Power Distribution, breakers, MCP, PQM, SPD
b. Building power distribution including conduit, cable trays and conductors
c. Building lighting
5. Instrumentation and controls:
a. Instruments including flow meters, pressure elements, temperature elements, pH analyzers
b. Fibre optic installed in existing conduit
c. PLC controls, I/O cards and remote I/O